Steel beams are installed for the upper spillway walls. Roller-compacted concrete (RCC) continues going in on the middle spillway. Crews prepare the area between the upper and lower chute for RCC by filling the crevasses with dental concrete. Rebar mats are set for structural concrete on the lower spillway.