Removal of West False River Emergency Drought Salinity Barrier
Removal of West False River Emergency Drought Salinity Barrier
This week, DWR began construction to remove the emergency drought salinity barrier along the West False River in the Delta. Read about the vital role the barrier has played in helping to minimize saltwater intrusion into the Delta while conserving freshwater resources in upstream reservoirs.
Read more about the scheduled removal of West False River Emergency Drought Salinity Barrier at
https://water.ca.gov/News/Blog/2022/Oct ... ty-Barrier
You do not have the required permissions to view the files attached to this post.
Copyright © 2013-2025 WesternBass.com ®